Find, Fix and Track Entity, FERC Docket No. RC12-1 (October 31, 2011)
Reliability Standard: FAC-014-2
Requirement: R5
Region: FRCC
Issue: FFT Entity self-certified that in 2009 it did not provide its System Operating Limits (SOLs), as required, to those entities with reliability-related needs.
Finding: FRCC found that the issue constituted only a minimal risk to BPS reliability since FFT Entity’s SOLs (which did not experience any significant changes in 2009) only effect FFT Entity and do not have an effect on the adjacent Planning Authorities. In addition, FFT Entity has a peak load of less than 100 MW and is only directed connected to one other TOP.